It includes the major stations works (e.g Cochrane and Bukit Bintang Central) and usage of boring machines.
| Tunnel Drive for Sungai Buloh-Kajang line |
| Tunnel Drive for Sungai Buloh-Kajang line |
A brief elaboration about Nu Sentral, it is a seven-storey retail mall (gross floor area of 1.2 million square feet) done by joint venture between MRCB and Pelaburan Hartanah Bhd. Claimed to be first integrated ‘green’ lifestyle retail mall.
The retail, dining and entertainment elements have been seamlessly planned across the vast floor area of the mall; for an enthralling experience.
The architectural design concept complements the Masterplan of the integrated Kuala Lumpur Sentral and its ‘live, work, play’ components.
| Artist impression of sky bridge near the present exit to KL Monorail |
| Signboard about the project |
| Supporting structure of the new sky bridge |
| The view from end of Monorail platform level. |
On the proposed realignment to Jalan Tun Tan Cheng Lock and the MRT Corp claim that it required the demolition of 29 buildings, Yong said, “Jalan Sultan is half the width of Jalan Tun Tan Cheng Lock; if tearing down buildings of that magnitude is necessary on a much wider road, it would only be worse in the case of Jalan Sultan,” he said.
| Proposed Pasar Seni MRT station |
The final alignment was determined using a three step process:-
Step 1: The first step is the establishment of fixed points along the corridor in which the MRT alignment must serve. These are major developments, centres of activity and landmarks. These points are densely populated areas, activity centres such as the Central Business District, shopping centers or office blocks or areas where there is potential future growth.
Step 2: Secondly, the alignment has to connect these fixed points. To arrive at the best alignment, a balance of six factors are given due consideration:-
Social impact to be minimized
Land acquisition to be minimized
Journey time to be optimized
Constructability (taking into consideration technical and ground conditions)
Integration with existing and future public transport networks
Ridership to be maximized and stations to be easily accessible
Step 3: Changes following public feedback gathering process.
Final alignment at Jalan Sultan/Jalan Petaling
The final alignment in the Jalan Sultan/Jalan Petaling area was determined using the three-step process described above.
The first step was the establishment of fixed points which the MRT alignment must serve. In this case the fixed points were the Pasar Seni LRT Station and future development at the former Merdeka Stadium and Stadium Negara area.
Pasar Seni LRT Station was identified as a fixed point because it will be the interchange point between the new MRT line and the existing Kelana Jaya LRT system. This integration point is crucial because it will enable users of the LRT system to change to the MRT and viceversa without needing to walk too far. Commuters will hop from one network to another without having to buy new tickets.
Another fixed point is the proposed Menara Warisan mixed development project where the present Merdeka Stadium and Stadium Negara are located. It will be a major centre of activity and will house a very large population of office and retail outlet workers.
Convenient access to public transport is critical to cater to such a large number of people and such a high level of activity.
The second step was to ensure that the alignment connected these fixed points taking into account the six factors mentioned above:-
Social impact would be minimized because the final alignment reduces the number of buildings that need to be acquired for or affected by the project
Land acquisition is minimised and will only involve government-owned properties namely Pasarama Kota, Plaza Warisan and Plaza UO
Journey time is optimized because the final alignment is a more direct route
Constructability along Jalan Sultan is good because the area has suitable soil conditions, no major obstructions, and the alignment managed to avoid tight curves
The final alignment integrates with the Kelana Jaya LRT line as well as the proposed Warisan Merdeka
The location of the station at Pasarama Kota is adjacent to the activity center of the Jalan Sultan/Jalan Petaling area thus making the station readily accessible to a major catchment area, thus having good potential ridership
The third step involved public scrutiny of the alignment where feedback was received during the three month period from February 14 to May 14, 2011. During this period, alternative alignments were proposed and these alignments were studied in great depth to find out if they were suitable.
| Logo of MMC-Gamuda |